Before EX10D
Generator reportedly activated during periods of low solar availability.
Field observation to validation
Kyogle provides a clear evidence sequence and a practical basis for independently controlled replication.
System configuration
Solar PV
Inverter
Battery
Property load
Extended operation
Generator reportedly activated during periods of low solar availability.
No generator fallback was reported across approximately 12 months, including adverse weather.
EX10D was removed at approximately 10:00 pm; the generator reportedly activated at approximately 3:00 am.
Next step
Solar irradiance (W/m²)
PV DC and inverter AC output
Battery state of charge and power
Property load
Generator runtime and fuel
Panel, inverter and battery temperatures
Independent, irradiance-normalised measurement would establish the magnitude, repeatability and statistical significance of the observed effect.